Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hinged spans for rarely opened bridges over Florida drainage canals
Area for drainage and flood control in south central Florida is covered by many waterways not designed for navigation, hence highway bridges need no provision for passage of commercial or pleasure craft; however, periodic passage of floating construction is required which may be opened on four days notice; movable span is 41 ft long; entire weight of movable unit is 39,800 lb.
Hinged spans for rarely opened bridges over Florida drainage canals
Area for drainage and flood control in south central Florida is covered by many waterways not designed for navigation, hence highway bridges need no provision for passage of commercial or pleasure craft; however, periodic passage of floating construction is required which may be opened on four days notice; movable span is 41 ft long; entire weight of movable unit is 39,800 lb.
Hinged spans for rarely opened bridges over Florida drainage canals
Civ Eng (NY)
Dean, Jr., W.E. (Autor:in)
1953
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Record three-hinged arch spans 278 ft
Engineering Index Backfile | 1954
Three-hinged masonry arches, long spans especially considered
Engineering Index Backfile | 1898
|Engineering Index Backfile | 1923
|The static calculation of skew three-hinged arch spans
Engineering Index Backfile | 1920
|