Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prestressed concrete bridge spans Humptulips river
Bridge in Washington built by U S Forest Service, consists of main span of 75 ft and two approach spans of 25 ft each; footings and piers were cast in place; caps and girders were cast in Tacoma and hauled to site; six girders are placed side by side, top flanges forming deck; procedure of tensioning; girder was tested with 43,000 lb at center.
Prestressed concrete bridge spans Humptulips river
Bridge in Washington built by U S Forest Service, consists of main span of 75 ft and two approach spans of 25 ft each; footings and piers were cast in place; caps and girders were cast in Tacoma and hauled to site; six girders are placed side by side, top flanges forming deck; procedure of tensioning; girder was tested with 43,000 lb at center.
Prestressed concrete bridge spans Humptulips river
Pacific Bldr Engr
1953
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed bridge spans Argyle cut
Engineering Index Backfile | 1957
Prestressed concrete bridge in Cuba spans nearly 300 ft
Engineering Index Backfile | 1955
|Prestressed concrete arch spans 353 ft
Engineering Index Backfile | 1950
|Prestressed cantilever spans Columbia
Engineering Index Backfile | 1964
|Prestressed-concrete bridge over river Tame
Engineering Index Backfile | 1950