Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New bridge over Chehalis River at Aberdeen, Wash, is double leaf bascule truss flanked by continuous steel deck plate girders and reinforced concrete approach spans; with steel followers between cutoff and base of driver some piles have effective length of 124 ft; driver with 75-leads specially designed for job; procedure for driving long piles.
New bridge over Chehalis River at Aberdeen, Wash, is double leaf bascule truss flanked by continuous steel deck plate girders and reinforced concrete approach spans; with steel followers between cutoff and base of driver some piles have effective length of 124 ft; driver with 75-leads specially designed for job; procedure for driving long piles.
Bridge piling 105 feet long
Western Construction
Finke, R.W. (Autor:in)
Western Construction ; 28
1953
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1995
British Library Conference Proceedings | 1989
|Bridge foundations. Use of modern piling
Engineering Index Backfile | 1935
Steel piling cofferdams for bridge piers
Engineering Index Backfile | 1906