Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Estimator can not foresee all possible contingencies affecting temporary costs; safer course is to bid on basic apparent requirements and include in bid statement of work covered; in this manner, price is explained to architect and, contractor has some recourse if extra temporary work is thrust upon him during job; factors which determine amount of temporary light and power which will be needed.
Estimator can not foresee all possible contingencies affecting temporary costs; safer course is to bid on basic apparent requirements and include in bid statement of work covered; in this manner, price is explained to architect and, contractor has some recourse if extra temporary work is thrust upon him during job; factors which determine amount of temporary light and power which will be needed.
How to estimate temporary wiring
Elec Construction Maintenance
Reynolds, J.P. (Autor:in)
1954
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Temporary power transmission wiring pole with long service life
Europäisches Patentamt | 2024
|WIRING TEMPORARY TRANSFER TOOL FOR MAST FORMER HOLE REBUILDING
Europäisches Patentamt | 2019
|TEMPORARY FLOOR STRUCTURE HAVING WIRING STRUCTURE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2018
|A Probabilistic Approach to the Fatigue Life Estimate of a Temporary Steel Bridge
British Library Conference Proceedings | 2009
|