Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Illustrated notes on lighting treatment provided for First Baptist Church in Asheville, NC; how nave was illuminated by installation of large 15-ft diam chandelier suspended from peak of dome; incorporated into ornamental design of unit are 20 PAR-38 floodlamps beamed downward and 20 beamed upward to reduce brightness contrast; treatment accorded balcony, chair, and other areas.
Illustrated notes on lighting treatment provided for First Baptist Church in Asheville, NC; how nave was illuminated by installation of large 15-ft diam chandelier suspended from peak of dome; incorporated into ornamental design of unit are 20 PAR-38 floodlamps beamed downward and 20 beamed upward to reduce brightness contrast; treatment accorded balcony, chair, and other areas.
Church relighting -- Prize problem
Illum Eng
Wells, G. (Autor:in)
1954
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Church relighting -- On low budget
Engineering Index Backfile | 1963
Relighting of the first church of christ, scientist, in Boston, Massachusetts
Engineering Index Backfile | 1928
|Relighting of Maidenhead bridge
Engineering Index Backfile | 1954
|Bank modernization features relighting
Engineering Index Backfile | 1950
Relighting of Gloucester Cathedral
Engineering Index Backfile | 1959
|