Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation design, borrow and fill methods, and high production of 40,000 cu yd per day marks progress at 273-ft high 2200-ft long earthfill reclamation dam on Snake River, Idaho; highlights of rock work, concrete production, and tunnel lining methods; cold weather roadmix for streets; embankments and concrete substructure for 536-ft continuous plate girder bridge.
Foundation design, borrow and fill methods, and high production of 40,000 cu yd per day marks progress at 273-ft high 2200-ft long earthfill reclamation dam on Snake River, Idaho; highlights of rock work, concrete production, and tunnel lining methods; cold weather roadmix for streets; embankments and concrete substructure for 536-ft continuous plate girder bridge.
Progress at Palisades dam
Pac Bldr Engr
Laing, R. (Autor:in)
1953
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1914
Bomb shelters in Hudson Palisades proposed
Engineering Index Backfile | 1943
The new Palisades tunnel, New York
Engineering Index Backfile | 1893
Mining the palisades for bridge Anchorages
Engineering Index Backfile | 1928