Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete control methods at Burrinjuck Dam, N.S.W.
Burrinjuck dam, originally completed in 1928 as irrigation water conservation dam on Murrumbidgee River, exhibited several undesirable features in use; remedial measures include minimizing percolation of water through old wall, increasing height and cross section of wall, and enlarging spillway discharge capacity; concrete materials and plant; concrete control; testing laboratory; curing with oil.
Concrete control methods at Burrinjuck Dam, N.S.W.
Burrinjuck dam, originally completed in 1928 as irrigation water conservation dam on Murrumbidgee River, exhibited several undesirable features in use; remedial measures include minimizing percolation of water through old wall, increasing height and cross section of wall, and enlarging spillway discharge capacity; concrete materials and plant; concrete control; testing laboratory; curing with oil.
Concrete control methods at Burrinjuck Dam, N.S.W.
Instn Engrs, Australia -- J
Muir, J.M. (Autor:in)
1954
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Burrinjuck Dam -- Strengthening and enlargement
Engineering Index Backfile | 1957
New Spillway Bridge at Burrinjuck Dam
British Library Conference Proceedings | 1994
|Elevated reservoir -- Petersham, N.S.W.
Engineering Index Backfile | 1965
Engineering Index Backfile | 1940
Hawkesbury river high bridge, N.S.W.
Engineering Index Backfile | 1954
|