Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method used in construction of single story freezer storage building of 350,000 cu ft capacity for California Consumers Corp, Los Angeles, Calif; refrigeration is provided by 18,000 ft or 1 1/4 in. pipe coils hung on ceiling.
Method used in construction of single story freezer storage building of 350,000 cu ft capacity for California Consumers Corp, Los Angeles, Calif; refrigeration is provided by 18,000 ft or 1 1/4 in. pipe coils hung on ceiling.
Warehouse addition built in 100 days
Indus Refrig
Gubser, R. (Autor:in)
1954
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
HUGE WAREHOUSE BUILT WITH CONCRETE
Online Contents | 1995
Panels built this new warehouse
Engineering Index Backfile | 1957
Semi-cylindrical warehouse built at low cost
Engineering Index Backfile | 1938
|Guam superhighway built in sixty days
Engineering Index Backfile | 1945
|