Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Main structure consists of two 2-hinge arches spaced at 7.2 m; thickness of arches 0.64 m, spans 29.9, 23. 48, and 18.42 m, respectively; total width 11.8 m; prestressed bridge was built by Wayss and Freytag; transverse joints above piers are covered by copper sheets, 1 mm thick and 24 mm wide.
Main structure consists of two 2-hinge arches spaced at 7.2 m; thickness of arches 0.64 m, spans 29.9, 23. 48, and 18.42 m, respectively; total width 11.8 m; prestressed bridge was built by Wayss and Freytag; transverse joints above piers are covered by copper sheets, 1 mm thick and 24 mm wide.
Danube bridge at Geisingen
Donaubruecke bei Geisingen
Laemmlein, A. (Autor:in)
1953
6 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of Dunaujvaros Danube bridge
British Library Conference Proceedings | 2006
|New danube bridge near grossmehring
Engineering Index Backfile | 1931
|The Budapest New Danube Bridge
DataCite | 2024
|New bridge over danube in Yugoslavia
Engineering Index Backfile | 1963
|Maximilian bridge over Danube at Deggendorf
Engineering Index Backfile | 1930
|