Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Timber pier construction made easy
Time cut in half for accurate aligning and cutting of piling for Richmond-San Rafael bridge project was achieved with structural device without further use of barges; work was done from 4×41 ft platform supported on ends of two bent booms.
Timber pier construction made easy
Time cut in half for accurate aligning and cutting of piling for Richmond-San Rafael bridge project was achieved with structural device without further use of barges; work was done from 4×41 ft platform supported on ends of two bent booms.
Timber pier construction made easy
Western Construction
Western Construction ; 29
1954
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pier construction device and pier construction method
Europäisches Patentamt | 2024
|Pier construction equipment and pier construction method
Europäisches Patentamt | 2021
|Pier construction device and pier construction method
Europäisches Patentamt | 2021
|Engineering Index Backfile | 1879
|