Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
M.I.R.A. proving ground
New additions to laboratory and proving ground of Motor Industry Research Assn at Lindley, Nuneaton, are high speed test circuit and new central laboratories; track consists of clay embankment with 9-in. cast-in-situ concrete paving; fatigue research program on crankshafts; illustrations. (see also Engineering v 177 n 4610 June 4 1954 p 730-1)
M.I.R.A. proving ground
New additions to laboratory and proving ground of Motor Industry Research Assn at Lindley, Nuneaton, are high speed test circuit and new central laboratories; track consists of clay embankment with 9-in. cast-in-situ concrete paving; fatigue research program on crankshafts; illustrations. (see also Engineering v 177 n 4610 June 4 1954 p 730-1)
M.I.R.A. proving ground
Engineer
Engineer ; 197
1954
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
Route 99: contractor's proving ground
Engineering Index Backfile | 1958
|Shelters for ammunition-proving ground
Engineering Index Backfile | 1941
Proving Ground - Hunter's Point, San Francisco
Online Contents | 2014
|Ground Proving Three Seismic Refraction Tomography Programs
British Library Online Contents | 2007
|