Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Apr 1 1926 n 13 p 526-529: Progressive construction program laid down after comprehensive investigation; design for ultimate population and area expected in 1960. Apr 15 n 18 p 606-608: Balanced regulators divert storm flow; cast-iron siphons in multiple; tunnel clay excavated with power knives in pilot holes and manholes dug from bottom. May 6 n 18 p 718-721: Pumps discharge through sub\ill\nerged concrete outlets; grease removed as elliptical skimmer takes out floating material.
Apr 1 1926 n 13 p 526-529: Progressive construction program laid down after comprehensive investigation; design for ultimate population and area expected in 1960. Apr 15 n 18 p 606-608: Balanced regulators divert storm flow; cast-iron siphons in multiple; tunnel clay excavated with power knives in pilot holes and manholes dug from bottom. May 6 n 18 p 718-721: Pumps discharge through sub\ill\nerged concrete outlets; grease removed as elliptical skimmer takes out floating material.
Toledo intercepting sewer system
Eng. News-Rec
Jones, H.P. (Autor:in)
1926
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hartford east side intercepting sewer
Engineering Index Backfile | 1910
Intercepting sewer at Elizabeth, N.J.
Engineering Index Backfile | 1910
Central intercepting sewer, borough of Swindon
Engineering Index Backfile | 1954
|Construction of Chicago intercepting sewer complicated
Engineering Index Backfile | 1928
|