Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of hydraulic fill road embankment
Fill 56-ft. wide averaging over 100,000 cu. yd. per mile built by dragline excavators and hydraulic dredge for Michigan road.
Construction of hydraulic fill road embankment
Fill 56-ft. wide averaging over 100,000 cu. yd. per mile built by dragline excavators and hydraulic dredge for Michigan road.
Construction of hydraulic fill road embankment
Eng. News-Rec
1926
2 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
High-fill embankment structure and construction method
Europäisches Patentamt | 2020
|Intake Structure Construction at Homogeneous Sand Fill Embankment Dam
British Library Conference Proceedings | 2006
|Embankment Construction with Saturated Clayey Fill Material Using Geocomposites
Online Contents | 2011
|High-fill embankment drainage blind ditch and construction method
Europäisches Patentamt | 2020
|