Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Grading, tunnels, bridges and culverts; tunnel with roof of concrete blocks and walls of varied types; riprap on fills along river; compressed-air foundations.
Grading, tunnels, bridges and culverts; tunnel with roof of concrete blocks and walls of varied types; riprap on fills along river; compressed-air foundations.
Construction work on a Chinese railway
Eng. News-Rec
Stringer, H. (Autor:in)
1926
4 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Preliminary work in railway construction
Engineering Index Backfile | 1897
Achievements and targets of Chinese Railway construction
IuD Bahn | 2003
|Development of Chinese railway informationization work in new era
IuD Bahn | 2002
|Construction work of underground railway under Osaka station
Engineering Index Backfile | 1937
|Construction of underground railway by I.C.O.S. work method
Engineering Index Backfile | 1962
|