Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underground ore-bin construction at the united verde
Ore from below Hopewell tunnel, which is at 1,000-ft. level, is delivered by skips to 2 bins which discharge through gates into standard-gage cars hauled by electric locomotive on tunnel level.
Underground ore-bin construction at the united verde
Ore from below Hopewell tunnel, which is at 1,000-ft. level, is delivered by skips to 2 bins which discharge through gates into standard-gage cars hauled by electric locomotive on tunnel level.
Underground ore-bin construction at the united verde
Eng. Min. Jl.-Press
Mills, C.E. (Autor:in)
1926
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Shaft construction methods at United Verde
Engineering Index Backfile | 1927
|Online Contents | 1996
|Ventilation problems at the united verde mine
Engineering Index Backfile | 1927
|Timber preservation at the United Verde Extension Mining Company
Engineering Index Backfile | 1925
|