Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Unusual piece of construction work was recently performed by Western Gas Construction Co., Fort Wayne, Ind., in adding third lift to two-lift holder; no provisions for which had been made when holder was originally built.
Unusual piece of construction work was recently performed by Western Gas Construction Co., Fort Wayne, Ind., in adding third lift to two-lift holder; no provisions for which had been made when holder was originally built.
An unusual holder problem
Gas Age-Rec
Perry, F.E. (Autor:in)
Gas Age-Record ; 58
1926
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1989
|Kölnbrein dam: an unusual solution for an unusual problem
Tema Archiv | 1991
|Watling street, Dartford -- Unusual problem
Engineering Index Backfile | 1956
|Water Hammer: Correcting an Unusual Problem
Wiley | 1937
|Solution of unusual subsurface drainage problem
Engineering Index Backfile | 1968
|