Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Discusses earth pressure due to mass of rocks, to mining and to increase in volume; methods of timbering; masonry work, concrete and torcrete work, rigid and elastic construction; reinforced concrete; reinforced-concrete molded brick; three-hinged arch construction, etc. (See also - no 16 Apr. 22 1926 pp.237-240; no.17 Apr 29 1926 pp. 253-257; no.18 May 6 1926, pp. 269-272, no. 19 May 13 1926 pp. 283-288)
Discusses earth pressure due to mass of rocks, to mining and to increase in volume; methods of timbering; masonry work, concrete and torcrete work, rigid and elastic construction; reinforced concrete; reinforced-concrete molded brick; three-hinged arch construction, etc. (See also - no 16 Apr. 22 1926 pp.237-240; no.17 Apr 29 1926 pp. 253-257; no.18 May 6 1926, pp. 269-272, no. 19 May 13 1926 pp. 283-288)
Walling and lining of galleries
Uber den Ausbau in Strecken und Abbauen
Philipp, H. (Autor:in)
Bergbau ; 39
1926
23 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1993
|British Library Online Contents | 1993
Online Contents | 1998