Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel methods used in building long concrete arch bridge
Pier foundation cylinders sunk from overhead suspension; raising and releasing steel arch centers for 304-ft. spans of Fort Snelling-Mendota Bridge, Minn.
Novel methods used in building long concrete arch bridge
Pier foundation cylinders sunk from overhead suspension; raising and releasing steel arch centers for 304-ft. spans of Fort Snelling-Mendota Bridge, Minn.
Novel methods used in building long concrete arch bridge
Eng. News-Rec
DeButts, W.H. (Autor:in)
1926
3 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Building America's longest concrete-arch bridge
Engineering Index Backfile | 1932
Engineering Index Backfile | 1895
|Long arch bridge built of slag concrete
Engineering Index Backfile | 1921
|