Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
15-year desert road plan starts
Plans for 4000 mi of paved roads (about 20% in mountainous and difficult terrain) and 7000 mi of unpaved (principally, soil stabilized) roads for Saudi Arabia, to be built during 15 yr; new primary routes will be two-lane highways with 23 ft wide wearing surface of hot-mix asphaltic concrete; participation of Saudi government, foreign contractors, and United Nations specialists.
15-year desert road plan starts
Plans for 4000 mi of paved roads (about 20% in mountainous and difficult terrain) and 7000 mi of unpaved (principally, soil stabilized) roads for Saudi Arabia, to be built during 15 yr; new primary routes will be two-lane highways with 23 ft wide wearing surface of hot-mix asphaltic concrete; participation of Saudi government, foreign contractors, and United Nations specialists.
15-year desert road plan starts
Eng News-Rec
Engineering News-Record ; 172
1964
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Mexican rail privatisation starts next year
British Library Online Contents | 1995
CCTV BASICS EFFECTIVE SCHOOL SECURITY STARTS WITH A PLAN
British Library Online Contents | 2004
South Carolina suspends roadside program, starts over with plan
British Library Online Contents | 1995
Rail competition starts in Finland next year
British Library Online Contents | 1998
Europe - Deza starts 3-year environment programme
Online Contents | 1998