Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cut and fill methods speeded by-pass project
Design for 5 km of bypass around Etampes, France, included raised grade of 5 m or higher, carried on embankment which required special drainage and selective use of soils for its construction; 5-phase earthmoving program and equipment, use of 6000 vertical sand draining wells to dry peat base, and asphalt surface laying are described.
Cut and fill methods speeded by-pass project
Design for 5 km of bypass around Etampes, France, included raised grade of 5 m or higher, carried on embankment which required special drainage and selective use of soils for its construction; 5-phase earthmoving program and equipment, use of 6000 vertical sand draining wells to dry peat base, and asphalt surface laying are described.
Cut and fill methods speeded by-pass project
World Construction
Mead, H.T. (Autor:in)
World Construction ; 16
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock cuts, tunnelling speeded by bolting
Engineering Index Backfile | 1956
Scrap handling speeded with automatic shear-baler
Engineering Index Backfile | 1954
|War contract settlements speeded by contractors' action
Engineering Index Backfile | 1944
|Sewer tunnel speeded by using mining equipment
Engineering Index Backfile | 1954
Triple push loading speeded Minnesota grading job
Engineering Index Backfile | 1945