Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Precast concrete construction saves port of Seattle time and money
Feature of design of 91,000 sq ft pier transit shed in Seattle is use of precast, pretensioned barrel shell roof sections for 150-ft clear span; building consists of 14 barrel shell bays, 12 of which are 40×162 ft; remaining two are combined into one actual bay of 80×162 ft; five shells and valley beam make complete barrel.
Precast concrete construction saves port of Seattle time and money
Feature of design of 91,000 sq ft pier transit shed in Seattle is use of precast, pretensioned barrel shell roof sections for 150-ft clear span; building consists of 14 barrel shell bays, 12 of which are 40×162 ft; remaining two are combined into one actual bay of 80×162 ft; five shells and valley beam make complete barrel.
Precast concrete construction saves port of Seattle time and money
Pac Bldr Engr
1964
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1949
Floor Cleaning Equipment Saves Time, Money
Taylor & Francis Verlag | 1962
|Cutting corners saves time and money
British Library Online Contents | 2012
|Scaffold system saves time and money
British Library Online Contents | 2013