Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Missouri River Basin Project is 3-zone earth fill structure 170 ft high and 2200 ft long; it has concrete lined chute type spillway over one abutment; glory hole inlet in reservoir will divert water into 2000-ft tunnel of 21 in. diam; purpose is to store water for irrigation and power.
Missouri River Basin Project is 3-zone earth fill structure 170 ft high and 2200 ft long; it has concrete lined chute type spillway over one abutment; glory hole inlet in reservoir will divert water into 2000-ft tunnel of 21 in. diam; purpose is to store water for irrigation and power.
Glendo dam hits fast pace
Pac Bldr Engr
Laing, R. (Autor:in)
1955
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Maine turnpike asphalt paving hits fast pace
Engineering Index Backfile | 1947
Hydrologic conditions near Glendo, Platte County, Wyoming
UB Braunschweig | 1965
|