Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction pore pressures in cobb earth dam
Graphic presentation of pressures at 34 piezometer heads installed in dam, read at intervals of about one week; during period for which results are discussed, construction of dam was practically completed and reservoir filled to more than half its height, but steady state of seepage through dam was not attained; pore pressures as percentages of fill pressures.
Construction pore pressures in cobb earth dam
Graphic presentation of pressures at 34 piezometer heads installed in dam, read at intervals of about one week; during period for which results are discussed, construction of dam was practically completed and reservoir filled to more than half its height, but steady state of seepage through dam was not attained; pore pressures as percentages of fill pressures.
Construction pore pressures in cobb earth dam
New Zealand Eng
Collins, N.W. (Autor:in)
1955
14 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Cobb Earth Dam
Engineering Index Backfile | 1955
|Construction pore pressures in earth dam
Engineering Index Backfile | 1968
|Construction pore pressures in three earth dams
Engineering Index Backfile | 1967
|Construction pore pressures in two earth dams
TIBKAT | 1978
|Construction pore pressures observed in rolled earth dams
Engineering Index Backfile | 1959
|