Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Measures taken to prevent leaks and to improve appearance of concrete dam walls at Trawsfynydd reservoir; surface cleaned and hacked; 4 in. × 4 in. × 8 gage steel fabric reinforcement fixed to face; application of gunite facing 1 1/2 in. thick; cracks opened and plugged with mastic bitumen; analysis of defects; recommendations for facings. (See also Civ Eng (Lond) v 51 n 595, 596, 597 Jan 1956 p 79-82, Feb p 196-8, Mar p 317-18)
Measures taken to prevent leaks and to improve appearance of concrete dam walls at Trawsfynydd reservoir; surface cleaned and hacked; 4 in. × 4 in. × 8 gage steel fabric reinforcement fixed to face; application of gunite facing 1 1/2 in. thick; cracks opened and plugged with mastic bitumen; analysis of defects; recommendations for facings. (See also Civ Eng (Lond) v 51 n 595, 596, 597 Jan 1956 p 79-82, Feb p 196-8, Mar p 317-18)
Refacing of four concrete dams
Water Water Eng
Ternan, W.G.M. (Autor:in)
1956
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Refacing of four concrete dams
Engineering Index Backfile | 1956
|Refacing dam with precast concrete slabs
Engineering Index Backfile | 1949
Engineering Index Backfile | 1939
Engineering Index Backfile | 1911
|TIBKAT | 1998
|