Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pulling bridge together
Endwise shift method used by Chilean State Railways for erecting continuous truss type bridge to replace 70-yr old span across Maule river; two sections, each 722 ft long were constructed on opposite banks; sections were moved on dollies over narrow gage track laid under each truss and extending on falsework. (See also Ry Age v 141 n 1 July 2 1956 p 32-3; Ry Track and Structures v 52 n 7 July 1956 p 38-40)
Pulling bridge together
Endwise shift method used by Chilean State Railways for erecting continuous truss type bridge to replace 70-yr old span across Maule river; two sections, each 722 ft long were constructed on opposite banks; sections were moved on dollies over narrow gage track laid under each truss and extending on falsework. (See also Ry Age v 141 n 1 July 2 1956 p 32-3; Ry Track and Structures v 52 n 7 July 1956 p 38-40)
Pulling bridge together
Ry Gaz
Railway Gazette ; 105
1956
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Engineering Index Backfile | 1956
Pulling it all Together With Integrated Specifications
Online Contents | 1996
Bridge prestress whole steel strand pulling equipment
Europäisches Patentamt | 2021
|Pulling together: River and rowing museum, Henley, England
British Library Online Contents | 1997
|