Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Salt, tide damage to bridges erased by novel face-lifting
On James River bridge system, near Newport News, Va, more than 2500 concrete piles were repaired, more than 6000 diaphragms were supported and pilecaps resurfaced in $1.4-million rehabilitation job.
Salt, tide damage to bridges erased by novel face-lifting
On James River bridge system, near Newport News, Va, more than 2500 concrete piles were repaired, more than 6000 diaphragms were supported and pilecaps resurfaced in $1.4-million rehabilitation job.
Salt, tide damage to bridges erased by novel face-lifting
Eng News-Rec
Vaccaro, G. (Autor:in)
Engineering News-Record ; 156
1956
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Taylor & Francis Verlag | 2024
|Hydraulic jacks for lifting iron bridges
Engineering Index Backfile | 1899
The invisible women: how female architects were erased from history
British Library Online Contents | 2017
|