Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pier construction methods on Burlington beach skyway
Largest bridge so far erected by Department of Highways of Ontario; with approaches, overall length is 4.37 mi; cost around $13, 000,000; three spans designed as continuous truss; illustrated description of substructure operations, pile foundations, and dewatering methods.
Pier construction methods on Burlington beach skyway
Largest bridge so far erected by Department of Highways of Ontario; with approaches, overall length is 4.37 mi; cost around $13, 000,000; three spans designed as continuous truss; illustrated description of substructure operations, pile foundations, and dewatering methods.
Pier construction methods on Burlington beach skyway
Roads Eng Construction
LeBourdais, E. (Autor:in)
1956
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Post-tensioning a Steel Bridge: Strengthening of the Burlington Skyway
British Library Conference Proceedings | 1990
|The Bay of Quinte Skyway: The Planning, Design and Construction of High Level Pier Replacements
British Library Conference Proceedings | 1995
|Assessing traffic impacts of lane closures on the QEW at Burlington Bay Skyway
British Library Conference Proceedings | 2000
|Engineering Index Backfile | 1959
|