Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Piers go down for Portland bridge
First step in construction of main pier of Morrison St. bridge in Portland, Ore, was predredging by clamshell with floating rig; then cofferdam crib was floated into place on barge; crib extended far enough on each side of barge to permit guide piles to be driven through it into stream bed.
Piers go down for Portland bridge
First step in construction of main pier of Morrison St. bridge in Portland, Ore, was predredging by clamshell with floating rig; then cofferdam crib was floated into place on barge; crib extended far enough on each side of barge to permit guide piles to be driven through it into stream bed.
Piers go down for Portland bridge
Western Construction
Western Construction ; 31
1956
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Up-Down Vibration Effects on Bridge Piers
British Library Online Contents | 1996
|Up-Down Vibration Effects on Bridge Piers
Online Contents | 1996
|Deep coffer-dam construction for bridge piers, Portland and Rumford falls
Engineering Index Backfile | 1897
|Engineering Index Backfile | 1893
|Engineering Index Backfile | 1926
|