Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Illustrates and describes a tunnel through solid limestone to provide a large power station with condensing water. (3500 w.) (No. 95971)
Illustrates and describes a tunnel through solid limestone to provide a large power station with condensing water. (3500 w.) (No. 95971)
Difficult tunneling for water supply
Power
Mason, H.R. (Autor:in)
1908
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New Techniques in Difficult Ground Tunneling
British Library Online Contents | 2000
|New Techniques in Difficult Ground Tunneling
British Library Conference Proceedings | 2000
|Tunneling in Difficult Conditions-The Squeezing Case
British Library Conference Proceedings | 2012
|Report workshop 3: Tunneling in difficult ground
British Library Conference Proceedings | 1995
|Tunneling in Difficult Conditions - The Squeezing Case
ASCE | 2012
|