Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Special problems in construction of schluchsee-schwarza tunnel
Main tunnel of hydroelectric development; 6200 m. long, 4.1 by 5 m. cross-section, designed to stand pressures of 43 to 91 m. of water; methods of tunneling and concreting; figures on use of explosives, power and cement; blasting and construction of lake intake, sinking of shaft 18 m. deep and 10 m. internal diam. (See also - nos. 22-23, 24 May 29, 1931, pp. 402-407, June 12, pp. 436-442)
Special problems in construction of schluchsee-schwarza tunnel
Main tunnel of hydroelectric development; 6200 m. long, 4.1 by 5 m. cross-section, designed to stand pressures of 43 to 91 m. of water; methods of tunneling and concreting; figures on use of explosives, power and cement; blasting and construction of lake intake, sinking of shaft 18 m. deep and 10 m. internal diam. (See also - nos. 22-23, 24 May 29, 1931, pp. 402-407, June 12, pp. 436-442)
Special problems in construction of schluchsee-schwarza tunnel
Besondere Bauaufgaben beim Bau des Schluchsee-Schwarza-Stollens
Wessely, A. (Autor:in)
Bauingenieur ; 12
1931
2 pages
28 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.