Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large scale construction managements -- Construction of Kembs hydroelectric power plant of the rhine
Detailed report on equipment, methods and organization of work for construction of concrete lined combined navigation and power canal 9 km. long, 13 m. deep and 120 m. bottom width, also construction of reinforced concrete structure for housing 6 Kaplan turbines 33,500 hp. each; construction involved 9,000,000 cu. m. of excavation.
Large scale construction managements -- Construction of Kembs hydroelectric power plant of the rhine
Detailed report on equipment, methods and organization of work for construction of concrete lined combined navigation and power canal 9 km. long, 13 m. deep and 120 m. bottom width, also construction of reinforced concrete structure for housing 6 Kaplan turbines 33,500 hp. each; construction involved 9,000,000 cu. m. of excavation.
Large scale construction managements -- Construction of Kembs hydroelectric power plant of the rhine
Baubetrieb auf Einer Grossbaustelle. -- Bau des Rheinkraftwerks Kembs
Strube, H. (Autor:in) / Rohde, H. (Autor:in)
Bauingenieur ; 12
1931
13 pages
19 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rhein River hydroelectric development at Kembs
Engineering Index Backfile | 1929
|Construction of Kembs Hydroelectric Power Plant on Rhine
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1930
|