Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Experience of Bernische Kraftwerke A.-G., in consolidating river embankment, 150 m. long, at Hagneck hydroelectric plant; graphic records of effect of waterproofing of embankment upon leakage at Hagneck diversion weir.
Experience of Bernische Kraftwerke A.-G., in consolidating river embankment, 150 m. long, at Hagneck hydroelectric plant; graphic records of effect of waterproofing of embankment upon leakage at Hagneck diversion weir.
Consolidation of embankments by cement grouting
Dammdichtung mittles Zement-Einspritzung
Meyer, E. (Autor:in)
1931
4 pages
12 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 1993
|Protection of Embankments During Drilling and Grouting
ASCE | 2012
|Protection of Embankments during Drilling and Grouting
British Library Conference Proceedings | 2012
|Finite element consolidation analysis of embankments
Elsevier | 1988
|Inspection of three railway embankments stabilised by grouting
Engineering Index Backfile | 1954