Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Super hydro station at Lake Grimsel
First work in upper stage from Grimsel to "Handeck"; experimental tunnel made in order to derive further information concerning properties of rock in "Spitallamm," where dam, 345 ft. high and 590 ft. long, is to be constructed for Grimsel storage lake; total quantity of water stored by Lake Grimsel dam will be 14,500,000,000 gal.; maximum output of first stage from Grimsel to turbine house in Breitenwald will be 100,000 hp. (See also Bohrhammer vol. 8, no. 76, Feb. 1928 pp. 15-22, 21 figs)
Super hydro station at Lake Grimsel
First work in upper stage from Grimsel to "Handeck"; experimental tunnel made in order to derive further information concerning properties of rock in "Spitallamm," where dam, 345 ft. high and 590 ft. long, is to be constructed for Grimsel storage lake; total quantity of water stored by Lake Grimsel dam will be 14,500,000,000 gal.; maximum output of first stage from Grimsel to turbine house in Breitenwald will be 100,000 hp. (See also Bohrhammer vol. 8, no. 76, Feb. 1928 pp. 15-22, 21 figs)
Super hydro station at Lake Grimsel
Switzerland
1928
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Super hydro station at Lake Grimsel
Engineering Index Backfile | 1928
Materials handling in construction of Grimsel dam
Engineering Index Backfile | 1930
|Verbundene Mikroporosität in Kristallingesteinen : Fallstudie Felslabor Grimsel
UB Braunschweig | 1999
|Borehole Sealing Project at the Grimsel Test Site
Online Contents | 2005
|Borehole Sealing Project at the Grimsel Test Site
British Library Online Contents | 2005
|