Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Alouette hydro-electric development
Principal construction features of development at Alouette Lake undertaken by British Columbia Electric Railway Co.; embankment built of dense clay; concrete dam and spillway; tunnel 3539 ft. long connects Alouette and Slave Lakes.
Alouette hydro-electric development
Principal construction features of development at Alouette Lake undertaken by British Columbia Electric Railway Co.; embankment built of dense clay; concrete dam and spillway; tunnel 3539 ft. long connects Alouette and Slave Lakes.
Alouette hydro-electric development
Can. Engr
Canadian Engineer ; 55
1928
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Alouette-Stave lake hydro development
Engineering Index Backfile | 1925
|Online Contents | 1994
The Alouette lakes development, British Columbia
Engineering Index Backfile | 1928
Construction methods on Alouette dam
Engineering Index Backfile | 1926
Alouette dam spillway rehabilitation
British Library Conference Proceedings | 1993
|