Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progress in hydro-electric installations, including intakes, leats, tunnels, dams, headraces, pipe-lines and tailraces
In 1920 total water power developed and in course of development throughout world was approximately 23,000,000 hp.; it is now approximately 35,000,000 and is increasing at rate of 1,500,000 hp. a year; size of installations has grown immensely. Abstract of paper read before Instn. Civil Engrs. (See also Engineering, vol. 125, no. 3258, June 22, 1928, pp. 786-787 and (discussion) 759; Water and Water Eng., vol. 30, no. 358, Oct. 1928, pp. 469-470 and (discussion) 470-473)
Progress in hydro-electric installations, including intakes, leats, tunnels, dams, headraces, pipe-lines and tailraces
In 1920 total water power developed and in course of development throughout world was approximately 23,000,000 hp.; it is now approximately 35,000,000 and is increasing at rate of 1,500,000 hp. a year; size of installations has grown immensely. Abstract of paper read before Instn. Civil Engrs. (See also Engineering, vol. 125, no. 3258, June 22, 1928, pp. 786-787 and (discussion) 759; Water and Water Eng., vol. 30, no. 358, Oct. 1928, pp. 469-470 and (discussion) 470-473)
Progress in hydro-electric installations, including intakes, leats, tunnels, dams, headraces, pipe-lines and tailraces
Engineer
McLellan, J. (Autor:in)
Engineer ; 145
1928
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1928
|Progress in Dams and Pipe Lines
Wiley | 1935
|Ejection into tailraces of hydropower plants
TIBKAT | 1968
|