Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A record achievement in terminal grain elevator construction
Description of Saskatchewan Pool elevator No. 7, at Port Arthur, Ont.; superstructure of 7,000,000-bu. structure involving placing of 95,000 cu. yd. of concrete completed in six months; statistics of operation; cleaning equipment; new features in plan of construction.
A record achievement in terminal grain elevator construction
Description of Saskatchewan Pool elevator No. 7, at Port Arthur, Ont.; superstructure of 7,000,000-bu. structure involving placing of 95,000 cu. yd. of concrete completed in six months; statistics of operation; cleaning equipment; new features in plan of construction.
A record achievement in terminal grain elevator construction
Contract Rec
Whitehead, D.V. (Autor:in)
1928
4 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete grain elevator construction
Engineering Index Backfile | 1913
|Recent grain-elevator construction
Engineering Index Backfile | 1904
|Improved concreting techniques facilitate grain elevator construction
Engineering Index Backfile | 1948
Improved concreting techniques facilitate grain elevator construction
Engineering Index Backfile | 1947
Engineering Index Backfile | 1887
|