Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Newport river bridge: laying of gas mains
Describes shifting mains to temporary bridge in 1922 and construction work after 1924 to reach, and cross on, new bridge; tunneling; " Victaulic" joints, in four segments made of steel alloy and are ductile; no need to make special provision for pipes to conform to camber of bridge, for joints are sufficiently flexible to permit of this being done automatically. Paper read before Wales and Monmouthshire Junior Gas Assn.
Newport river bridge: laying of gas mains
Describes shifting mains to temporary bridge in 1922 and construction work after 1924 to reach, and cross on, new bridge; tunneling; " Victaulic" joints, in four segments made of steel alloy and are ductile; no need to make special provision for pipes to conform to camber of bridge, for joints are sufficiently flexible to permit of this being done automatically. Paper read before Wales and Monmouthshire Junior Gas Assn.
Newport river bridge: laying of gas mains
Gas Jl
Hazell, H.D. (Autor:in)
Gas Journal ; 182
1928
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Laying water mains across river
Engineering Index Backfile | 1887
|Engineering Index Backfile | 1896
|Engineering Index Backfile | 1896
|Wiley | 1930
|Engineering Index Backfile | 1889
|