Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of new structure completed at Fordham University; devised to correct some of vagaries of earthquake recorder; temperature variation; wind and industrial vibrations overcome.
Design and construction of new structure completed at Fordham University; devised to correct some of vagaries of earthquake recorder; temperature variation; wind and industrial vibrations overcome.
The new seismic station at Fordham
Instruments
Tynan, J.W. (Autor:in)
Instruments ; 1
1928
3 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Flexible electrical design at Fordham
Engineering Index Backfile | 1965
|Lilker Associates Takes Fordham Place Green
British Library Online Contents | 2008
Capturing and enhancing light in buildings - MAX FORDHAM
Online Contents | 2007