Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of dam is of multiple-dome type; total cost, $4,500, 000; work involved large amount of excavation; contractors have met construction problem with efficient plant, carefully designed to minimize hand labor; entire concrete construction plant was designed for placement of concrete at rate of 2000 cu. yd. per day; discusses camp, shops, excavation plant, river-control details, cableways, electric installation, gravel plant, etc.
Design of dam is of multiple-dome type; total cost, $4,500, 000; work involved large amount of excavation; contractors have met construction problem with efficient plant, carefully designed to minimize hand labor; entire concrete construction plant was designed for placement of concrete at rate of 2000 cu. yd. per day; discusses camp, shops, excavation plant, river-control details, cableways, electric installation, gravel plant, etc.
Coolidge dam construction plant
West. Constr. News
Hull, H.B. (Autor:in)
1928
13 pages
18 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of coolidge dam
Engineering Index Backfile | 1929
|Construction methods and plant layout at Coolidge dam, in Arizona
Engineering Index Backfile | 1929
|Construction features, Coolidge Multiple-Dome dam
Engineering Index Backfile | 1928
Engineering Index Backfile | 1927
|