Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
San gabriel flood -- Control dam in immediate prospect
Bids opened Nov. 14 on dam requiring 3,800,000 cu. yd. of concrete; six years necessary for completion of structure of arched gravity type, 425 ft. above stream bed and 500 ft. above deepest rock excavations, which will develop storage capacity of 240,000 acre-ft.
San gabriel flood -- Control dam in immediate prospect
Bids opened Nov. 14 on dam requiring 3,800,000 cu. yd. of concrete; six years necessary for completion of structure of arched gravity type, 425 ft. above stream bed and 500 ft. above deepest rock excavations, which will develop storage capacity of 240,000 acre-ft.
San gabriel flood -- Control dam in immediate prospect
Eng. News-Rec
Engineering News Record ; 101
1928
2 pages
1 Fig.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
San Gabriel River flood control
Engineering Index Backfile | 1935
Control of flood debris in San Gabriel area
Engineering Index Backfile | 1944
|Bids on big san Gabriel dam, $25,000,000 flood control project to be opened July 11
Engineering Index Backfile | 1927
TIBKAT | 1968
|Gabriel Goes Gold - Gabriel Poole's medal-winning career
Online Contents | 1998