Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Water control in excavating a dam foundation
Springs developed in seamy rock strata at sharp inclination; local drains took flow outside of forms; flow permanently sealed by 2000 ft. of 5- and 6-in. grout holes; new dam for Mount Union (Pa.) water supply; foundation rock and refill; seepage drains; drilling grout holes; grouting procedure.
Water control in excavating a dam foundation
Springs developed in seamy rock strata at sharp inclination; local drains took flow outside of forms; flow permanently sealed by 2000 ft. of 5- and 6-in. grout holes; new dam for Mount Union (Pa.) water supply; foundation rock and refill; seepage drains; drilling grout holes; grouting procedure.
Water control in excavating a dam foundation
Eng. News-Rec
Gruber, W.W. (Autor:in)
Engineering News Record ; 100
1928
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Excavating system of deep foundation pit and excavating construction method of deep foundation pit
Europäisches Patentamt | 2022
|Deep foundation pit excavating device with open-close type excavating head
Europäisches Patentamt | 2021
|