Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lafayette. Lafayette rolled earth-fill Dam
Partial failure before completion of central portion by settlement; by Sept. 21, 1928, area nearly 500 ft. sq. had sunk 20 ft.; cracks show dry, homogeneous, and well compacted fill, therefore cause of failure cannot be attributed to methods of construction; article does not give causes of settlement.
Lafayette. Lafayette rolled earth-fill Dam
Partial failure before completion of central portion by settlement; by Sept. 21, 1928, area nearly 500 ft. sq. had sunk 20 ft.; cracks show dry, homogeneous, and well compacted fill, therefore cause of failure cannot be attributed to methods of construction; article does not give causes of settlement.
Lafayette. Lafayette rolled earth-fill Dam
West. Constr. News
1928
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lafayette rolled earth-fill dam
Engineering Index Backfile | 1928
|The Lafayette rolled earth-fill dam
Engineering Index Backfile | 1927
Uncompleted Lafayette rolled-fill earth dam damaged by movement
Engineering Index Backfile | 1928
|Online Contents | 2002
British Library Online Contents | 1996
|