Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Discusses methods of painting and putting on bituminous and cement grout coatings to protect huge gates, weighing 768 to 1443 tons apiece, from rust and attacks of mussels and barnacles of sea-acorn variety.
Discusses methods of painting and putting on bituminous and cement grout coatings to protect huge gates, weighing 768 to 1443 tons apiece, from rust and attacks of mussels and barnacles of sea-acorn variety.
Maintenance and repairs. Maintenance of the lock gates of the Kaiser Wilhelm canal
Die Unterhaltung der Schiebetore der Schleusen des Kaiser-Wilhelm-Kanals
Hayssen (Autor:in)
Bautechnik ; 6
1928
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1907
Building Panama canal lock gates
Engineering Index Backfile | 1911
Construction repairs & maintenance
TIBKAT | 1.1985 - 2.1986
Lock gates for Dallas-Celilo canal
Engineering Index Backfile | 1914
Concrete Maintenance and Repairs
British Library Conference Proceedings | 2008
|