Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
C. and O. to renew bridge over Ohio River
New bridge will have channel span of 675 ft. center to center of piers with flanking spans of 450 ft. each; superstructure will consist of through trusses continuous over three spans; to increase number of tracks; both open dredging and pneumatic work on river piers; weight division supports and load distribution.
C. and O. to renew bridge over Ohio River
New bridge will have channel span of 675 ft. center to center of piers with flanking spans of 450 ft. each; superstructure will consist of through trusses continuous over three spans; to increase number of tracks; both open dredging and pneumatic work on river piers; weight division supports and load distribution.
C. and O. to renew bridge over Ohio River
Ry. Age
Railway Age ; 85
1928
5 pages
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Beaver bridge over the Ohio river
Engineering Index Backfile | 1913
|The Sewickley Cantilever Bridge Over the Ohio River
ASCE | 2021
|Closure to “Sciotoville Bridge Over the Ohio River”
ASCE | 2021
|Discussion of “Sciotoville Bridge Over the Ohio River”
ASCE | 2021
|The Sewickley cantilever bridge over the Ohio River
Engineering Index Backfile | 1912
|