Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progress of the Sydney harbor bridge
General description of work completed and to be done, with costs; length of main bridge and steel approaches is 3770 ft.; provision is made for central roadway 57 ft. wide, four electric-railway tracks, two on each side of roadway and two footways each 10 ft. one on each side of structure.
Progress of the Sydney harbor bridge
General description of work completed and to be done, with costs; length of main bridge and steel approaches is 3770 ft.; provision is made for central roadway 57 ft. wide, four electric-railway tracks, two on each side of roadway and two footways each 10 ft. one on each side of structure.
Progress of the Sydney harbor bridge
Commonwealth Engr
Bradfield, J.J.C. (Autor:in)
1927
4 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress on Sydney harbor bridge
Engineering Index Backfile | 1930
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1931
|Engineering Index Backfile | 1908
Sydney harbor bridge completed
Engineering Index Backfile | 1932
|