Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
City of Windsor and Ontario Hydro-Electric Commission built bridge across Michigan Central Railway tunnel cut to carry radials and highways; reinforced-concrete girder bridge of three spans supported on concrete piers and abutments; center span is 42 ft.; total cost of bridge was $43,000.
City of Windsor and Ontario Hydro-Electric Commission built bridge across Michigan Central Railway tunnel cut to carry radials and highways; reinforced-concrete girder bridge of three spans supported on concrete piers and abutments; center span is 42 ft.; total cost of bridge was $43,000.
Field Avenue bridge, Windsor, Ontario
Can. Engr
Robertson, H. (Autor:in)
Canadian Engineer ; 55
1928
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1928
Online Contents | 2017
|Reconstruction of Windsor Bridge Piers
British Library Online Contents | 1996
|Online Contents | 2017
|