Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Eume hydro-electric scheme
64 Mw Eume project is part of ultimate 532 Mw scheme of Spain; 103 m high arch dam has free spillway over top; surge chamber consists of top expansion chamber and lower chamber joined by vertical stabilizer shaft; power house comprises two 37,500 hp Francis turbines operating at 256 m head and two 32,000 kw alternators.
Eume hydro-electric scheme
64 Mw Eume project is part of ultimate 532 Mw scheme of Spain; 103 m high arch dam has free spillway over top; surge chamber consists of top expansion chamber and lower chamber joined by vertical stabilizer shaft; power house comprises two 37,500 hp Francis turbines operating at 256 m head and two 32,000 kw alternators.
Eume hydro-electric scheme
Water Power
Quiroga Pineyro, L.F. (Autor:in)
Water Power ; 12
1960
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
Engineering Index Backfile | 1960
|Engineering Index Backfile | 1956
Mulungushi hydro-electric scheme
Engineering Index Backfile | 1925
Engineering Index Backfile | 1960