Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geography and climate; 20 m high gravity dam; underground power plant for six Pelton units of 25 Mw each; at present only two units are installed; waterhead is 400 m; desanding arrangement.
Hydroelectric development of Del Pato Canyon
L'amenagement hydroelectrique du Canon del Pato (Perou)
Bejui, H. (Autor:in)
Construction ; 14
1959
9 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
C~anon del Pato refurbishment gets under way
Online Contents | 1997
Safety during construction of hydroelectric stations in a narrow canyon
Online Contents | 1972
|Safety during construction of hydroelectric stations in a narrow canyon
Springer Verlag | 1972
|PATO: Producibility-Aware Topology Optimization Using Deep Learning for Metal Additive Manufacturing
Springer Verlag | 2024
|