Niagara project -- Design
Summary of design features of 2200 Mw hydroelectric project; flow characteristics, soil and rock formations; Tuscarora pumped storage and generating plant with 12 motor-generator units of 20,000 kw each; 45,000 acre-ft storage reservoir between embankments; Lewiston power plant with 13 generating units of 150 Mw each; Lewiston switchyard; open and covered water supply canals; administration and construction management of project.
Niagara project -- Design
Summary of design features of 2200 Mw hydroelectric project; flow characteristics, soil and rock formations; Tuscarora pumped storage and generating plant with 12 motor-generator units of 20,000 kw each; 45,000 acre-ft storage reservoir between embankments; Lewiston power plant with 13 generating units of 150 Mw each; Lewiston switchyard; open and covered water supply canals; administration and construction management of project.
Niagara project -- Design
Boston Soc Civ Engrs -- J
Rich, G.R. (Autor:in) / Hall, W.M. (Autor:in)
1960
30 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2007
|British Library Conference Proceedings | 2007
|Design/Build Agreement for the Niagara Tunnel Project
British Library Conference Proceedings | 2007
|Design/Build Agreement for the Niagara Tunnel Project
British Library Conference Proceedings | 2007
|Ontario hydro project at Niagara Falls
Engineering Index Backfile | 1953
|