Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Kelsey generating station dam and dykes
Power plant for International Nickel Co's mining and smelting operations will have 210,000 hp initial installed capacity; construction of 120 ft high, 955 ft long rockfill dam across river and of dikes erected upon both unfrozen and permanently frozen foundations; it was necessary to complete construction of core within heated enclosures placed upon dam; it is expected that foundations under sand dikes will thaw gradually due to heat from reservoir.
Kelsey generating station dam and dykes
Power plant for International Nickel Co's mining and smelting operations will have 210,000 hp initial installed capacity; construction of 120 ft high, 955 ft long rockfill dam across river and of dikes erected upon both unfrozen and permanently frozen foundations; it was necessary to complete construction of core within heated enclosures placed upon dam; it is expected that foundations under sand dikes will thaw gradually due to heat from reservoir.
Kelsey generating station dam and dykes
Eng J
Macdonald, D.H. (Autor:in) / Pillman, R.A. (Autor:in) / Hopper, H.R. (Autor:in)
Engineering Journal ; 43
1960
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Instability of dykes at Seven Sisters Generating Station
Online Contents | 2004
|Instability of dykes at Seven Sisters Generating Station
British Library Online Contents | 2004
|Investigations of Permafrost Affected Foundations for the Gull Generating Station Dykes
British Library Conference Proceedings | 1992
|TIBKAT | 2011
|British Library Conference Proceedings | 2002
|